Installation Checklist

Saved Drafts:
First Steps – In the Office
Second Steps – Prior to Being Boxed Away
Final Steps – Day of Installation
Client Hardware Verification & Location
Till Drawer Fires
Printer Prints
KP Set Up
Attach Photos
ℹ️️ Note: Pictures will not be saved with the draft.
Signatures